Plotline

Plotline is an upcoming AI project management tool. I designed its time logging flow, where employees punch in their time against their work.

Role

Product Designer

Duration

3 months

Category

Tech

Tools

Figma, Miro

To design a flow inside Plotline that lets employees log their time directly and convieniently

Objective

Outcome

3 way time logging flow to track hours in real time, manually, or via calendar sync

Impact

Logging an entry takes < 40 seconds, compared to 60 to 85 seconds on the Alpha version of the App. That’s roughly 33 to 53% faster.

Employees can log their time in the way that suits how they work, all inside the same tool.

During the de-brief, I was taught about the features of the product and was given a rough outline about how users log their time.

After the initial meetings, I brainstormed elements and features that would improve the time logging experience. I focused on making the workflow more flexible, clear, and easy to follow, and explored different ways to structure how time is logged.

Pin icon image

01

Adaptability

Supporting different workflows and working styles

Pin icon image

02

Clarity

Keeping information easy to understand and navigate

Pin icon image

03

Status

Clearly showing logged, pending, and completed time

Pin icon image

05

Activity visibility

Showing the number of tasks logged per day in the calendar

Pin icon image

04

Efficiancy

Reducing steps and saving time across the workflow

Project

requirements

Timer, Form, Calendar

Three ways to log time, a timer, a form, and a calendar, all ending in the same details and submit step, so employees pick whichever fits how they work.

The Problem

Initial to Final designs

In 10 weeks, wireframes became a final design that cuts entry time from 60 to 85 seconds to under 40.

Progression

From "Drag" to "Slots"

Before: A drag and select timeline. Review and testing showed it was inefficient because it needed focus and put a load on the mind.

After: 20 minute time slots throughout the day. Users select a slot and set the exact time themselves, which takes less focus and less mental effort.

Design Iterations

Final screens

The final designs bring time logging into three flows: a timer, a form, and a calendar. Each one ends in the same details and submit step. The calendar uses 20 minute time slots, and the timesheet keeps an overview of past entries.

Final Prototype

Reflections

Mistakes are part of the process. Review and testing showed my first design wasn’t as efficient as I thought. I changed it, and I learned that finding problems early is a good thing, because it’s much easier to fix them then.

Deadlines are less scary with a plan. Going from wireframes to final design in 10 weeks felt intimidating at first. Working through it step by step, with early reviews and testing, taught me that a tight deadline is manageable when you keep changing direction quickly instead of waiting for the perfect version.